Mounting Cage Cabinet
STEP 4: Cage - Cage Cabinet
Step 4.1
Tools: 24mm wrench
Because of weight we recommend being two persons to carry the Cage Cabinet to the cage
Position it like shown in the picture, it will rest its weight on the handrail
Now hold it to make sure it doesnt tip while attaching the bolts to the U-brackets
Make sure the cabinet is firmly attached
Step 4.2 - General cable management
To avoid breakage of the connectors during operation, we use a cable clamp that have been tested to withstand a pulling force of 80kg or more. With a force bigger than this- the cable will slip, and it is therefore important to have some slack on the inside of the cabinet (slack between the cable clamp and the connector of the cables).
The cable should not be bent more than a radius of 70mm.
Step 4.3 - Power Cable
Use the cable clamp from 4.2 before connecting to cabinet
Connect the 230VAC connector to port 5 inside the Cage Cabinet
Connect the other end to your Power-Supply-Cabinet
Use strips/rope/tape to attach the cable to the underside of the cage-handrail. We recommend to use strips on every vertical post, with some slack on the cable in between