/
Mounting Cage Cabinet

Mounting Cage Cabinet

STEP 4: Cage - Cage Cabinet

 Step 4.1

  1. Tools: 24mm wrench

  2. Because of weight we recommend being two persons to carry the Cage Cabinet to the cage

  3. Position it like shown in the picture, it will rest its weight on the handrail

  4. Now hold it to make sure it doesnt tip while attaching the bolts to the U-brackets

  5. Make sure the cabinet is firmly attached

 

Step 4.2 - General cable management

To avoid breakage of the connectors during operation, we use a cable clamp that have been tested to withstand a pulling force of 80kg or more. With a force bigger than this- the cable will slip, and it is therefore important to have some slack on the inside of the cabinet (slack between the cable clamp and the connector of the cables).

image-20240611-080510.png

The cable should not be bent more than a radius of 70mm.


Step 4.3 - Power Cable

  • Connect the 230VAC connector to port 5 inside the Cage Cabinet

  • Connect the other end to Power-Supply-Cabinet

  • Use the quick-straps to attach the cable to the handrail. We recommend to use atleast one strap per vertical post.

Related content

Information checklist for site installation and documentation.
Information checklist for site installation and documentation.
More like this
Planning placement of equipment in/on cage
Planning placement of equipment in/on cage
More like this
How to connect the Cage Cabinet to a wired cage network.
How to connect the Cage Cabinet to a wired cage network.
More like this
Physical installation of CageEye farm-server
🇬🇧
Physical installation of CageEye farm-server
Read with this
[Template] Cage and barge documentation
[Template] Cage and barge documentation
Read with this