SOP cage cabinet production

SOP for production and assembly of cage cabinet

 

  1. Build outer cabinet according to CageEye production drawing 15-01-010-ASSY-Cabinet Drawing.

  2. Build cage bracket according to CageEye production drawing 11-03-006-ASSY-FBracketAssembly Drawing

  3. Mount pre build inner cabinet into cage outer cabinet.

  4. Mount Huber+Suhner SENCITY® Omni-SR Dome Antenna Product code

    1399.17.0106 to cage cabinet according to

  5. Mount pre assembled Nightshift® M21 Positionsljus 12V | Amber/GUL LED on top of cage cabinet. Secure with silicon glue.