STRESS TEST
Before the test meal: switch all cages to the active mode
📋 Steps
Feeding control via FA4
- 1. Cage 1: Start feeding -->> Flush a pipe for a minute -> confirm that the blower has started.
- 2. Cage
- 2. Cage 1: Change the intensity during pipe flush-> confirm that the feeding is not started in Feeding System.
- 3. Start a meal with 1 kg/min intensity -> confirm that feed spreader started.