Before the test meal:
Switch all cages to the active mode by bulk
- 1. Cage 1: Start feeding -> confirm that we do receive the feeding data from the feeding system and we can see it in FA4
- 2. Cage 1: Change intensity to -> confirm that intensity is changed in Feeding System and you can see in FA4
- 3. Adjust the intensity back and forth -> confirm that it is adjusted by the feeding system and you can these changes in FA4 and logs
- 4.
- 5.
- 6. Stop the meal -> confirm that it is stopped in the feeding system ad it stopped in
Stress test
- 9.