Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Checklist

Value

Company

Collected by CageEye.

Site name

Collected by CageEye.

Site ID

Collected by CageEye.

Site coordinates

Collected by CageEye.

Contact information to project owner for the customer.

Collected by CageEye.

Number of cages:

Cage type

Ex. 25x25m steel. 160m Circle.

Net depht and type

Important to know what the wanted depth of our bottom sensor is, so we can prepare the sensor distance already in our production.

Cage handrail vertical post type:

Ex. Rectangular Steel, plastic. Ideally a picture and/or measurements.
It is important for us to know that our cage-bracket is compatible in good time before installing.
Picture of these with dimensions are valuable to us.

Power connector type at the cage

This is info that we use to produce the power cables, so we know we are able to power our equipment through your power cabinet on cage.
Alt1: IP44 Blue Cable Mount 3P Industrial Power Plug (Link)
Alt2: Støpsel Jord Gummi IP54 250V 16A (Link)
Alt3: ….tbc

Power cable length needed from power supply cabinet to CageEye cabinet.

Our standard solution is 25m. Please see this document for more information.

If we are to use wired network on the cage: Find the lenght needed between switch and Cage Cabinet.

Cage-fuse for our equipment

We require a fuse (6-16A). Usually the fuses are directly connected to the power outlet of the power distribution cabinet on cage.
Please confirm that a fuse is ready for us on all cages?

Antenna mount on barge roof

We want pictures of the roof, showing where we can physically mount our antenna. We also want a picture showing the cage-view from this position.

Antenna-to-inside-barge cable

We have to pull a outdoor network cable from the antenna to inside the barge (where our network equipment will be). To do this effectively, we need to know the route. The best way to give us information is by providing pictures showing the route, and what cable length we need to bring.

Contact information to personnel at the site and shift information.

Barge control: [Phone] [email]

Site manager: [Name]      
Tel.:    
Mail:

Shift 1 Even week number.

  • [Name] [phone] [email]


Shift 2 Odd week number.

  • [Name] [phone] [email]

Contact information to IT department responsible for the site

IT:  [Name], [role] [phone] [email]

Contact information to operational technology(OT) department responsible for the site

OT:  [Name], [role] [phone] [email]

Address of site landbase for recieving goods:

Address of site landbase for personell transport:

Population data

Cage 1 number of fish:
Cage 1 avg weight:

Cage 2 number of fish:
Cage 2 avg weight:

Pipe lengths to cages:

Cage 1:
Cage 2:
Cage 3:

Fish group id

Cage 1:
Cage 2:
Cage 3:

...